CLEVELAND CLINIC FOUNDATION
Weston, Florida
Weston Hospital Building Project. Communications engineering services for subsystems required for a new 233,000 SF Hospital and
220,000 SF Doctors Office Building. Work includes underground communications service entry, PBX room make-ready, computer room make-ready,
outside plant and inter-building cabling, Tel/Data structure cabling plan, PBX Telephone System, LAN hubs and switches and Wide Area
Networking (WAN).
CLEVELAND CLINIC
Naples, Florida
Hospital and Clinic Facility. Tel/Data consulting engineering services including telephone cable plant, LAN horizontal and
backbone cabling, and system components. In addition, BR+A is working with the CCF network services staff to specify cabling, PBX hardware
and LAN hub electronics throughout both the new clinic buildings.
THE METROHEALTH SYSTEM
Cleveland, Ohio
Peri-operative and Integrated Lab Facility. Telephone and Data cabling specification and scope of work section for inclusion
in the General Contractors Construction Documents (CD) set. The document includes the Contractor Tel/Data Scope of Work and Contractor
Coordination Requirements. Specifications were written for materials requirements and installation criteria including labeling, testing
and acceptance.
PARTNERS HEALTHCARE - SPAULDING REHABILITATION HOSPITAL
Boston, Massachusetts
PBX System Replacement and Cutover. On-site project management services to include scheduling of various project phases and
milestones. Coordinated with the hospital's MIS staff and department representatives to achieve the goals and objectives required by the
hospital. Prepared reports, survey notes, pictures and detailed sketches to illustrate and provide installation recommendations during
the project. Attended project meetings to monitor progress and report back to the hospital MIS Staff and assisted the hospital during
the sign-off phases of projects to gather records and systems operation manuals and documentation, including as-built drawings.
CAMBRIDGE PUBLIC HEALTH COMMISSION (Cambridge and Somerville Hospitals)
Cambridge, Massachusetts
Strategic Communications Master Plan. Comprehensive scope of work involved a telephone riser study and cable plant upgrade
recommendation for buildings on three main sites. Also provided a study of the existing Centrex service and made recommendations for
10-year plan. Project resulted in the development of and RFP to replace the current Centrex service with PBX systems throughout the
affiliated Cambridge and Somerville sites over the next two years.
BRANDEIS UNIVERSITY
Waltham, Massachusetts
Campus-Wide Network Upgrade. Underground manhole survey for the communications duct system. Documentation included telephone,
Data and CATV for over seventy buildings campus-wide, including two railroad right-of-ways. BR+A also provided building structured cabling
design and room make-ready drawings and specifications for thirty-two dormitory buildings for rewiring in the summer of 1998.
OBERLIN COLLEGE
Oberlin, Ohio
New Science Facility. New 220,000 SF Science and Physics building project including both new construction, renovation and demolition
phases for a project completion in 2002. The facility is designed to coordinate the installation of both current and future technologies
such as 10/100 BaseT, Gigabit Ethernet, Asynchronous Transfer Mode (ATM) and wireless networks. The cable infrastructure will be based on
copper unshielded-twisted pair (UTP) and fiber optic, as well as enhanced conduit and raceways for future unknown systems.
HARVARD MEDICAL SCHOOL LONGWOOD CAMPUS
Boston, Massachusetts
Fiber Optic Survey and Upgrade Report. Survey of existing inter-building fiber optic cabling system for data communications.
Developed report and recommendation for protection of cables against damage and specified a redundant loop in order to prevent any network
downtime in the future.
WASHINGTON UNIVERSITY SCHOOL OF MEDICINE
St. Louis, Missouri
PBRB Tel / Data. Tel/Data Communications Distribution Design to assist the communication systems design team during the new
220,000 SF Pediatric Research Facility construction project. Responsibilities include design and specification of voice and data cabling
and connectivity, including workstation and backbone components. Work also includes underground communications service entry, equipment
room make-ready and outside plant and inter-building cabling.
LAFAYETTE COLLEGE
Easton, Pennsylvania
Olin Hall Science Facility. Tel/Data Cabling Design and Construction Administration for the new and renovated portions of Olin
Hall. The project consists of approximately 95,000 SF on four floors housing offices, classrooms and research labs. Project involves an
existing portion for renovation, areas of demolition and new construction. Responsible to define both inside telephone and data cabling,
as well as outside plant cabling requirements to provide connectivity to the campus backbone. Design considerations included network hubs
a fiber optic building backbone system and high-speed LAN/Data cabling to each office, lab and classroom area.
UNIVERSITY OF NORTH CAROLINA
Greensboro, North Carolina
Undergraduate Science Facility. Assisted UNCG Facilities Design and Construction with the development of a structured wiring system
documents for the new 140,000 SF Science Facility. Services included review of current campus standards, delivery of schematic and design
development documents. BR+A also provided review and recommendations for dedicated communications rooms to accommodate current and future
capacities.